High-performance durable gas fired hot water boiler
Product description
1.Furnace big, high radiate, three return design, combustion air is full, high-efficiency heating surface. Using high thermal resistance of insulation materials, boilers, heat losses to the minimum
2.More than 90% thermal efficiency. Intelligent, automatically control, with automatic temperature regulation, over-temperature standby.
3.Burners are used by importing, pressure spray, burning completely, low noise. thus Combustion intensity will be reduced dust emissions reduction of harmful gases.
4.Confined by connecting structure, safe, reliable, long service life. Super temperature, cut water, overload, ignition failure, abnormal flameout, gas boiler pressure, all can do self-test multiple chain protection.
Product Details
Type | CLHS0.06-95/70-Y.Q | CLHS0.12-95/70-Y.Q | CLHS0.17-95/70-Y.Q | CLHS0.23-95/70-Y.Q | CLHS0.35-95/70-Y.Q | CLHS0.47-95/70-Y.Q |
Project | Unit |
Rated heat | MW | 0.06 | 0.12 | 0.17 | 0.23 | 0.35 | 0.47 |
total heat | 104kcal | 5 | 10 | 15 | 20 | 30 | 40 |
Rated working pressure | MPa | atmosphric pressure |
Fuel consumption | Light diesel oil | kg/h | 5.4 | 10.8 | 16.2 | 21.6 | 32.5 | 43.2 |
Natural gas | Nm3/h | 5.8 | 11.7 | 17.5 | 23.4 | 35 | 46.8 |
Liquefied gas | Nm3/h | 2.5 | 5 | 7.5 | 10 | 15 | 20 |
Pipeline gas | Nm3/h | 14.2 | 28.3 | 42.5 | 56.6 | 85 | 113.2 |
Infall caliber | DN | 50 | 65 | 65 | 65 | 65 | 80 |
Effluent caliber | DN | 50 | 65 | 65 | 65 | 65 | 80 |
Blowndown valve caliber | DN | 25 | 25 | 25 | 25 | 25 | 40 |
Voltage | V | 220 | 220 | 220 | 220 | 380 | 380 |
Overall size | Length | mm | 800 | 980 | 1150 | 1250 | 1500 | 1550 |
Width | mm | 700 | 850 | 900 | 1000 | 1200 | 1250 |
Hight | mm | 1300 | 1650 | 1800 | 1950 | 2000 | 2100 |
Weight | kg | 270 | 410 | 450 | 520 | 830 | 980 |
FAQ
Q1.What’s your advantage? Why we choose you?
1)19 Years experience of test pen production and R&D.We have the most professional techniques and team. More advantage in price
2)Great production capacity Sustainable Supply . According to customer requirements, We support the customized include package.
3)We use 100% new materials and the best production process, in consequence our defective rate is lower than 0.01%.
Q2: How long and how to get sample from you ?
1) We can make as per your request, please provide us artwork in PDF to follow, you only need to pay for the transportation freight and the products sample cost, but once bulk order placed, we will refund you the sample cost.
2) Sample lead time: about 15 days
3) Sample payment: we accept sample payment sent by West Union, paypal, T/T
Q3.Are you a factory or trading company?
Main Products:
Steam boilers,hot water boilers,thermail oil heaters,pressure vessels’ design etc.
Q4.How Can I Get Protected If I Trade With You Company?
1) We are a legal and registered company in China. We are also Paid Members of Alibaba.
2) You are welcomed to use Alibaba Trade Assurance Order which can give you a full protection.
3) You are also welcomed use Secure Payment of Alibaba for small Orders
Q5: What about the production?
A: Produce time is 20~45days for <6Ton boiler, 45~60days for >8Ton boiler.
Q6: Could you offer some wear parts?
A: Yes, some chain grate bars, electric equipments in control panel box for example.
Q7: What about the maintenance?
A: I will offer you the timely maintenance way sheet after installation of the boiler mainly parts.